Try Before You Buy

Download a free sample of any of our exam questions and answers

  • 24/7 customer support, Secure shopping site
  • Free One year updates to match real exam scenarios
  • If you failed your exam after buying our products we will refund the full amount back to you.

Authentic Best resources for C-TPLM40-65 Test Engine Practice Exam [Q11-Q29]

Share

Authentic Best resources for C-TPLM40-65 Test Engine Practice Exam

[2022] C-TPLM40-65 PDF Questions - Perfect Prospect To Go With VCE4Dumps Practice Exam


SAP C-TPLM40-65 Certification Exam Topics:

Topic AreasTopic Details, Courses, Books
Implement QM in Discrete Manufacturing > 12%

Describe the unique processes for implementing QM in Discrete Manufacturing

Quality Certificates < 8%

Describe the purpose and features of Quality Certificates

Quality Notifications < 8%

Describe the purpose and features of Quality Notifications

Implement & Configure Quality Inspection 8% - 12%

Explain the configuration requirements of Quality Inspection

Implement & Configure Quality Planning 8% - 12%

Explain the configuration requirements of Quality Planning

Integration of QM and MM < 8%

Describe how QM integrates with Materials Management

Sample Management < 8%

Describe the purpose and features of Sample Management.

Implement & Configure Quality Control > 12%

Explain the configuration requirements of Quality Control

Configuration and Organization < 8%

Configure Organizational elements used in QM

QM in Process Industries < 8%

Describe the QM business processes used in Process Industries

Integration of QM with S&D and Service < 8%

Describe how QM integrates with Sales and Service



C-TPLM40-65 Exam Certification Details:

Level:Associate
Cut Score:55%
Sub-solution:SAP Application Overview
Component:Strategic Enterprise Management
Sample Questions: SAP C-TPLM40-65 Exam Sample Question
Exam:80 questions
Duration:180 mins
Languages:German, English

 

NEW QUESTION 11
The Software Deployment Manager (SDM) runs in its own Java Virtual Machine.

  • A. Incorrect
  • B. Correct

Answer: B

 

NEW QUESTION 12
You want to print a certificate for an outbound delivery, at which level is a certificate printed?

  • A. Delivery header level
  • B. Delivery Item level
  • C. Shipping point level
  • D. Material level

Answer: B

 

NEW QUESTION 13
Which statements are correct? (More than one answer is true.)

  • A. You can define the QM system for the vendor in the vendor master record.
  • B. The goods receipt posting for a certified vendor does not create an inspection lot.
  • C. The QM System entered in the quality info record overrides the QM system entered in the vendor master record.
  • D. In the procurement process, quality management is not involved in requests for quotation

Answer: A,B

 

NEW QUESTION 14
Notification category 05 belongs to-----.

  • A. Service notification
  • B. Claim notifications
  • C. Maintenance notifications
  • D. General notifications
  • E. Quality notifications

Answer: D

 

NEW QUESTION 15
Your customer wants to add the quality score of a material as criterion for the vendor evaluation Where do you set the calculation procedure for the quality score?

  • A. Quality info record in procurement
  • B. Material master
  • C. UD code
  • D. Vendor master

Answer: C

 

NEW QUESTION 16
The internal service request (ISR) is used to enter and process certain subjects (such as inquiries or problem descriptions) on the

  • A. Incorrect
  • B. Correct

Answer: B

 

NEW QUESTION 17
An inspection is completed when the usage decision is made.

  • A. Incorrect
  • B. Correct

Answer: B

 

NEW QUESTION 18
Which statements are true? (More than one answer is true.)

  • A. Specifications are copied from the inspection plan to the inspection lot.
  • B. If you work without a change number, the old values in the task list are overwritten by new values.
  • C. Change master records are identified by the change number.
  • D. Specifications are copied from the inspection lot to the inspection plan.

Answer: A,B

 

NEW QUESTION 19
What type of task lists can the calibration planner assign to a maintenance plan to perform a calibration inspection? Note : 2 correct answer

  • A. Equipment task list
  • B. Inspection plan
  • C. Standard routing
  • D. General task list
  • E. Functional location task list

Answer: A,D

 

NEW QUESTION 20
In which of the following you can display the information for multiple specifications functions and valuate them at characteristic level:

  • A. Record inspection results for the batch
  • B. Record inspection results for the operation
  • C. Record inspection results for the inspection point
  • D. Results Recording Worklist
  • E. Record inspection results for the lot

Answer: A

Explanation:
Explanation/Reference:

 

NEW QUESTION 21
Which is a product that is based on mySAP Business Suite and contains business functions from other SAP applications?

  • A. Enterprises Industry Solutions
  • B. Applications for Small and Midsize

Answer: B

 

NEW QUESTION 22
The dynamic modification rule defines the inspection stages and the conditions for an inspection stage change.

  • A. Correct
  • B. Incorrect

Answer: B

 

NEW QUESTION 23
You can access the inspection history from:

  • A. Results recording
  • B. The usage decision
  • C. Inspection report
  • D. Inspection type

Answer: A,B

 

NEW QUESTION 24
The inspection types and their process parameters can be assigned to the material in the material master using the inspection setup in the QM view.

  • A. Correct
  • B. Incorrect

Answer: B

 

NEW QUESTION 25
The call object for scheduling in stability studies is the inspection Group.

  • A. Correct
  • B. Incorrect

Answer: B

 

NEW QUESTION 26
Which catalogue types require the use of selection sets? Correct 2

  • A. Tasks
  • B. Defect type
  • C. Usage decision
  • D. Actions
  • E. Characteristic

Answer: C,E

 

NEW QUESTION 27
Which statements are correct? (More than one answers are true)

  • A. The material specification can't be used for a basic quality inspection with planned inspection characteristics.
  • B. You assign the required master inspection characteristics to the material in the material specification.
  • C. Dynamic modification of the inspection scope is not possible when a material specification is used.
  • D. The material specification is valid for all clients.
  • E. You can assign work centers or production resources/tools in the material specification.

Answer: C,E

 

NEW QUESTION 28
When you assign the inspection methods to the master inspection characteristics, only inspection methods with a validity date that corresponds to the master inspection characteristic are proposed.

  • A. Incorrect
  • B. Correct

Answer: B

Explanation:
Explanation/Reference:

 

NEW QUESTION 29
......

Best updated resource for C-TPLM40-65 Online Practice Exam: https://certkingdom.vce4dumps.com/C-TPLM40-65-latest-dumps.html