Try Before You Buy

Download a free sample of any of our exam questions and answers

  • 24/7 customer support, Secure shopping site
  • Free One year updates to match real exam scenarios
  • If you failed your exam after buying our products we will refund the full amount back to you.

[Jan 01, 2024] C_TS411_2022 PDF Questions and Testing Engine With 80 Questions [Q30-Q55]

Share

[Jan 01, 2024] C_TS411_2022 PDF Questions and Testing Engine With 80 Questions

Updated Exam Engine for C_TS411_2022 Exam Free Demo & 365 Day Updates

NEW QUESTION # 30
A user releases a document info record with a change number. What effect does this action have on the document info record?Note: There are 2 correct Answers to this question.

  • A. All document fields are locked.
  • B. The document info record uses the validity of a change number.
  • C. The document gets a revision level.
  • D. The document displays the release key of the change number.

Answer: B,C


NEW QUESTION # 31
Which prerequisites must be fulfilled before a configuration profile can be created and released for a configurable material?

  • A. At least one variant class must be assigned to the configurable material. Values must not be assigned to the characteristics here.
  • B. At least one variant class must be assigned to the configurable material. Values must be assigned to the characteristics here.
  • C. At least one variant class must be assigned to the configurable material.
  • D. Exactly one variant class must be assigned to the configurable material.

Answer: A


NEW QUESTION # 32
The processing mode is set in the configuration profile and in the object dependencies. What needs to be taken into account?Note: There are 3 correct Answers to this question.

  • A. The processing mode of object dependencies assigned to characteristics and characteristic values must be the same as that of the configuration profile.
  • B. The processing mode of object dependencies assigned to BOM and routing must be the same as that of the configuration profile.
  • C. The processing mode of object dependencies assigned to BOM and routing must always be "Classic" (independent of the configuration profile).
  • D. The processing mode of object dependencies assigned to the configuration profile must be the same as that of the configuration profile.
  • E. The processing mode of dependencies assigned to characteristics and characteristic values must always be "Advanced Variant Configuration" (independent of the configuration profile).

Answer: A,B,D


NEW QUESTION # 33
You can assign material components to operations.What needs to be taken into account?

  • A. You can only assign material components that are components of a material BOM.
  • B. You can only assign material components that were previously assigned to the header material.
  • C. You can only assign material components that have also been assigned to the routing as production resources and tools.
  • D. You can only assign each material component, when the material master exists and is known in the plant.

Answer: C


NEW QUESTION # 34
Which secure storage areas can be used inside a document info record?Note: There are 2 correct Answers to this question.

  • A. FTP File Server
  • B. SAP Database
  • C. HTTP Content Server
  • D. RFC Archive

Answer: B,C


NEW QUESTION # 35
Which routing objects can object dependencies be assigned to?Note: There are 3 correct Answers to this question.

  • A. Sequences
  • B. Inspection Characteristics
  • C. Operations
  • D. Component Allocation
  • E. Production Resource Tools

Answer: A,C,E


NEW QUESTION # 36
Which configuration process/scenario requires subitems in sales orders?

  • A. Planned/Production Order without BOM explosion
  • B. Planned/Production Order with BOM explosion
  • C. Sales Order (SET processing)
  • D. Order BOM

Answer: C


NEW QUESTION # 37
The customer wants to see the cross-plant material status inside the object search in classification. How do you satisfy the customer's requirement?

  • A. Create a reference characteristic.
  • B. Change the screen sequence of the classification view.
  • C. Add the cross-plant material status field to the database classification table.
  • D. Create a custom data type in customizing.

Answer: A


NEW QUESTION # 38
Which material types are used for configurable material masters?Note: There are 2 correct Answers to this question.

  • A. Material type KMAT - each material master of this material type can be configured in a fixed way.
  • B. Each material type can be used in standard customizing for configurable material masters.
  • C. Material type KMAT - configurable materials can only be created with this material type.
  • D. Material types KMAT, HALB, and FERT - configurable materials can only be created with these material types.

Answer: B,C


NEW QUESTION # 39
What do you have to keep in mind when working with value hierarchies?Note: There are 2 correct Answers to this question.

  • A. Only available for characteristics with CHAR or NUM format.
  • B. Value nodes are not values.
  • C. Value nodes are values.
  • D. Only available for characteristics with CHAR format.

Answer: B,D


NEW QUESTION # 40
What is the significance of the Additional Data tab in class maintenance?

  • A. It only exists for variant classes. It controls the use in configuration profiles.
  • B. It only exists for class nodes. It controls the usage in BOMs.
  • C. It exists for all class types. It controls the permitted object types.
  • D. It only exists for class nodes. It controls the usage in routings.

Answer: B


NEW QUESTION # 41
What do you have to keep in mind when copying a group BOM to a plant specific BOM?Note: There are
2 correct Answers to this question.

  • A. The BOM usage can be changed.
  • B. The material component must have a plant assignment.
  • C. The header status has to be active.
  • D. The internal BOM number stays unchanged.

Answer: B,D


NEW QUESTION # 42
Where can you specify a processing sequence during an assignment?

  • A. Pre- and Selection Conditions
  • B. Constraints
  • C. Procedures
  • D. Constraint Nets

Answer: C


NEW QUESTION # 43
For which objects can you define a status network?Note: There are 2 correct Answers to this question.

  • A. Change number record
  • B. Material master record
  • C. Document info record
  • D. Change record

Answer: C,D


NEW QUESTION # 44
What can you do when the class status is set to locked?Note: There are 2 correct Answers to this question.

  • A. Maintain the class.
  • B. Assign this class to a superior class.
  • C. Maintain a classification.
  • D. Find objects in this class.

Answer: A,D


NEW QUESTION # 45
The Work Center provides default values for the routing.Which of these default values is a mandatory entry if an operation is created in the routing?

  • A. Control key
  • B. Work Center
  • C. Standard value key
  • D. Standard text key

Answer: A


NEW QUESTION # 46
To which object of a Task List can you directly assign production resources/tools?

  • A. Headers
  • B. Operations
  • C. Material assignments
  • D. Sequences

Answer: B


NEW QUESTION # 47
There are item categories that are only allowed in configurable BOMs.What do you have to keep in mind when working with configurable routings?Note: There are 3 correct Answers to this question.

  • A. All production resources/tools catgories can be used in non-configurable and configurable routings.
  • B. All types of operation can be used in non-configurable and configurable routings.
  • C. Alternative sequences may only be used in configurable routings.
  • D. Equipment as production resources/tools may only be used in configurable routings.
  • E. All sequence categories can be used in non-configurable and configurable routings.

Answer: B,C,D


NEW QUESTION # 48
You assigned a released characteristic to a class. What happens when you change the characteristic status to locked?Note: There are 2 correct Answers to this question.

  • A. You cannot change the status as the characteristic is assigned.
  • B. This has no effect on the assigned classes or objects.
  • C. You can no longer assign this characteristic to other classes.
  • D. The characteristic is invisible in classes and objects.

Answer: B,C


NEW QUESTION # 49
In a single-level configuration, you want to use a constraint so that if characteristic C1 has the value V1, then characteristic C2 is assigned the value V2.C1 and C2 are assigned to class (300)T_FCL00.What would be a correct complete constraint?

  • A. RESTRICTION: $self.C2 = 'V2' if $self.C1 = 'V1'
  • B. RESTRICTION: ?T_FCL00.C2 = 'V2' if ?T_FCL00.C1 = 'V1'
  • C. RESTRICTION: ?C2 = 'V2' if ?C1 = 'V1'
  • D. RESTRICTION: (300)T_FCL00.C2 = 'V2' if (300)T_FCL00.C1 = 'V1'

Answer: D


NEW QUESTION # 50
Which scenario is possible when you create plant specific data with the Product Master app?

  • A. You can only define one plant information inside Product Master.
  • B. You can define multiple plant information inside Product Master.
  • C. You can define multiple plant information outside Product Master.
  • D. You can only define one plant information outside Product Master.

Answer: B


NEW QUESTION # 51
Which scenarios are available with the Maintain Bill of Material app?Note: There are 2 correct Answers to this question.

  • A. Define Software Constraints.
  • B. Display Valid From and Valid To information.
  • C. Create a Version BOM.
  • D. Attach a change order.

Answer: A,C


NEW QUESTION # 52
Which item category is only available in configurable BOMs?

  • A. Variable-size item (R)
  • B. Document item (D)
  • C. Non-stock item (N)
  • D. Class item (K)

Answer: D


NEW QUESTION # 53
Why is a Work Center assigned to a Cost Center?

  • A. For scheduling to determine transportation time and queue time
  • B. For assignment to find suitable people
  • C. For costing to use activity types
  • D. For capacity to use shift sequences

Answer: C


NEW QUESTION # 54
What is the meaning of the operation number in the routing?

  • A. It determines the sequence in which the operations are processed. The increment contains wait time and move time.
  • B. Similar to the BOM, it is only a sort sequence. The increment has no significance.
  • C. It determines the sequence in which the operations are processed. The increment has no significance.
  • D. It determines the sequence in which the operations are processed. The increment contains time buffers (float before and after production).

Answer: D


NEW QUESTION # 55
......