SAP C-TS422-2020 Questions and Answers Guarantee you Oass the Test Easily
Share Latest C-TS422-2020 DUMP with 150 Questions and Answers
SAP S/4HANA Production Planning and Manufacturing Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books | Weighting |
|---|---|---|
| Advanced Planning in SAP S/4HANA | Outline the basics and master data of advanced planning, explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts TS421, TS422 (SAP S/4HANA 2020) | > 12% |
| Demand Management in SAP S/4HANA | Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning. TS421, TS422 (SAP S/4HANA 2020) | < 8% |
| Process Orders in SAP S/4HANA | Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP). TS421, TS422 (SAP S/4HANA 2020) | < 8% |
| Production Orders in SAP S/4HANA | Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation. TS421, TS422 (SAP S/4HANA 2020) | > 12% |
| Introduction to SAP S/4HANA Production Planning | Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning. TS421, TS422 (SAP S/4HANA 2020) | < 8% |
| Capacity Planning in SAP S/4HANA | Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics. TS421, TS422 (SAP S/4HANA 2020) | 8% - 12% |
| Material Requirements Planning in SAP S/4HANA | Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures. TS421, TS422 (SAP S/4HANA 2020) | 8% - 12% |
SAP C-TS422-2020 Exam Description:
The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and inādepth technical skills to participate as a member of a project team in a mentored role.
C-TS422-2020 Exam Certification Details:
| Level: | Associate |
| Sample Questions: | SAP C-TS422-2020 Exam Sample Question |
| Languages: | English |
| Duration: | 180 mins |
NEW QUESTION 26
In which customizing activity do you set up automatic routing selection production orders?
Please choose the correct answer.
- A. Define order-type-dependent parameter
- B. Define selection profiles
- C. Define production scheduling profile
- D. Define scheduling parameters for production orders
Answer: A
NEW QUESTION 27
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks?
- A. Use batch determination.
- B. Use the material where-used report.
- C. Use the batch information cockpit.
- D. Use the material staging report.
Answer: C
NEW QUESTION 28
You want to schedule an order in the graphical planning board. What are valid planning directions?
There are 2 correct answers to this question.
- A. Squeezing in
- B. Infinite sequencing
- C. Backwards
- D. Forward with reverse
Answer: C,D
NEW QUESTION 29
What are some of the advantages of using Kanban? There are 2 correct answers to this question.
- A. It is mostly accomplished by manual postings
- B. It is a simplified form of production control
- C. Replenishments are created close to the actual need
- D. Replenishments are based on centralized planning
Answer: B,C
NEW QUESTION 30
Which SAP solutions can be used for forecast ng in Supply Chain Planning? Note: There are 2 correct answers to this question.
- A. Integrated Business Planning (IBP)
- B. Capacity Requirements Planning (CRP)
- C. Material Requirements Planning (MRP)
- D. Supply Chain Management (SCM)
Answer: A,D
NEW QUESTION 31
Your project team decides to use a make-to-order planning strategy for a strategic material in discretemanufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.
- A. Production orders are created with sales order reference.
- B. Sales order-specific planning run is required.
- C. Net requirements calculation is sales order-specific.
- D. Sales order-specific stock is created
- E. Storage location MRP areas are required.
Answer: A,C,D
NEW QUESTION 32
At the end of the MRP run you receive the exception message "Reschedule In Operation". What caused the message to be generated?
- A. The requirement no longer exists
- B. The requirements date occurs that of a firmed planned receipt
- C. The requirements date occurs before that of a firmed planned receipt
- D. A firmed planned receipt cannot be rescheduled
Answer: C
NEW QUESTION 33
In which of the following master data objects can you define the production order default storage location for a material component? There are 2 correct answers to this question.
- A. Material master of the finished product
- B. BOM, in the item for the material
- C. Material master of the finished product
- D. Work center, in the production supply area
Answer: B,D
NEW QUESTION 34
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.
- A. To increase the number of planning levels
- B. To reduce the number of changes required in bills of material
- C. To make the assignment of components easier
- D. To reduce the number of material masters
- E. Tosimplify the structure of bills of material
Answer: B,C,E
NEW QUESTION 35
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?
- A. Material requirements planning
- B. Forecast planning
- C. Consumption-based planning
- D. Manual planning without check
Answer: C
NEW QUESTION 36
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. To stage different components for a production line simultaneously
- B. To reduce the totalproduction lead time for along production line
- C. To provide timely updates of inventory management for the staged components
- D. To determine the work in progress along the production line
Answer: C,D
NEW QUESTION 37
A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system.
Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts?
- A. Finite resource and finite strategy
- B. Infinite resource and infinite strategy
- C. Infinite resource and finite strategy
- D. Finite resource and infinite strategy
Answer: A
NEW QUESTION 38
You have maintained the parameters for simple discontinuation the material master of a component. Which business process will be affected if the available stockis zero and the discontinuation date is in the past?
- A. Back flushing
- B. Material requirements planning
- C. Kanban
- D. Production order release
Answer: B
NEW QUESTION 39
Which material master setting is required to use the repetitive planning table for production with production orders?
- A. An overall profile be assigned on the Work Scheduling view
- B. A repetitive manufacturing profile must be assigned on the MRP4 view
- C. At least one valid production version must exist on the MRP4 view
- D. The Selection Method must be set to "2 Selection by production version".
Answer: B
NEW QUESTION 40
You want to perform capacity availability checks on your production orders. What must be set for this to occur? Note: Thereare 2 correct answers to this question.
- A. Checking control must have an overall profile assigned in customizing.
- B. Checking rule and group must be assigned.
- C. Indicator Relevant for finite scheduling must be set.
- D. PRT Availability check must be set.
Answer: A,C
NEW QUESTION 41
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. Whatdetermines whether the storage location can be derived from the production version?
- A. MRP Group
- B. MRP Profile
- C. MRP Controller
- D. Plant Data
Answer: A
NEW QUESTION 42
MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?
- A. It is converted into a planned order.
- B. It is converted into a production order.
- C. It is converted into a schedule line.
- D. It is converted into a reservation.
Answer: D
NEW QUESTION 43
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?
There are 2 correct answers to this question.
- A. By usage probability
- B. First in first out (FIFO)
- C. 100% check
- D. Simultaneous
Answer: A,C
NEW QUESTION 44
You are creating a production order manually. What activities are involved in this process?
There are 3 correct answers to this question.
- A. Actual cost calculation
- B. Order type determination
- C. Master data selection
- D. Planning selection
- E. Capacity requirements determination
Answer: B,C,E
NEW QUESTION 45
What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?
- A. The planned order's components are copied from the picking list.
- B. The planned order is converted to a production order.
- C. The planned order's component availability is checked
- D. The planned order generates capacity requirements.
Answer: D
NEW QUESTION 46
You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination logic when a planned order is created?
- A. Component availability
- B. Quota arrangement
- C. Delivery date
- D. Costs
- E. Vendor rating
Answer: B
NEW QUESTION 47
You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?
- A. Scheduling working time only
- B. Find Slot
- C. Insert operation
- D. Squeezing
Answer: B
NEW QUESTION 48
......